During a recent demolition job, asbestos insulation material was discovered within the steel girders of a former nightclub. The high-level
beams are plasterboarded and there is asbestos-containing material spread behind them.
Asbestos-related hazards
Because the fibres are often broken and pose a significant risk in asbestos debris, they must be removed under strict supervision and
reported to the HSE.
Putting up the containment to keep asbestos waste out
In this case, the old nightclub called Rusty Blues in Glasgow had rubbish strewn throughout the whole space. This means that the entire
huge space has been built up as a controlled enclosure, with polythene covering and protecting certain parts.
Asbestos removal put up within an old nightclub
Only asbestos workers wearing complete PPE are allowed to enter the area once it has been set up. They’ll then carefully remove the
plasterboard covering, revealing the trash hidden behind.
Inside a former nightclub, asbestos rubbish on beams behind plasterboard, inside a previous nightclub, asbestos debris on beams behind
plasterboard, inside a former nightclub, asbestos debris on beams behind plasterboard, inside a former nightclub, asbestos debris on
beams behind plasterboard, inside a former nightclub, asbestos debris on beams behind plasterboard, inside a former nightclub, asbestos
debris on beams behind plasterboard, inside a former nightclub, asbestos debris on beams behind plasterboard, inside a former nightclub
A three-stage bag lock and air lock mechanism are included in the enclosure. Metal frames and 1000-gauge polythene are used to
construct it. To guarantee that no asbestos fibres escape through the polythene, this is industry standard. This eliminates the possibility of
contaminants entering the atmosphere.
Asbestos workers can be seen putting this system together, preparing it to completely encapsulate the space.
Set up an asbestos enclosure with an airlock and a baglock.
Before any work begins, an integrity test, often known as a smoke test, will be performed. This is a good time to point out any possible
weak spots in the cage. If any smoke escapes, there is a structural flaw that has to be addressed.
The completion of this section of the project will take a few weeks. After that, an impartial analyst will come into the region and thoroughly
check the area for any asbestos residue. They will pronounce the area clean if they are satisfied that no asbestos fibres remain in the
area, including any minor fractures in the bricks.
If you stumble across asbestos debris, you must treat it with great caution and contact a professional asbestos removal firm immediately.